Risk Assessment of Offshore Wind Power Project Investment in the Grid-Parity Era: A Monte Carlo Simulation Approach

Main Article Content

J. N. Tan
S. T. Xie

Abstract

This study investigates the economic viability and investment risks of offshore wind power projects in the grid-parity era. As offshore wind generation increasingly relies on advanced electromagnetic energy conversion systems, intelligent grid infrastructures, and real-time communication networks for stable power transmission and operational monitoring, accurate investment risk evaluation has become essential for sustainable project development. A stochastic risk assessment framework based on Net Present Value-at-Risk (NPV-at-Risk) and Internal Rate of Return-at-Risk (IRR-at-Risk) is established and applied to grid-parity offshore wind projects using Monte Carlo simulation. The cumulative probability distributions of NPV and IRR are derived to quantify investment uncertainty, while grid-connected electricity volume, feed-in tariff, and construction investment are identified as the dominant sensitivity factors affecting project performance. Based on the simulation outcomes, targeted risk management strategies are proposed for governments, investors, and financial institutions to improve decision-making under uncertain market conditions. The proposed framework provides a practical methodology for evaluating offshore renewable energy investments and offers valuable guidance for intelligent power systems supported by electromagnetic information transmission and smart grid communication technologies.

Downloads

Download data is not yet available.

Article Details

How to Cite
Tan, J. N., & Xie, S. T. (2026). Risk Assessment of Offshore Wind Power Project Investment in the Grid-Parity Era: A Monte Carlo Simulation Approach. Advanced Electromagnetics, 15(3), 2448–2455. https://doi.org/10.7716/aem.v15i3.3298
Section
Research Articles

References

A. Valipour, H. Sarvari, and J. Tamosaitiene, “Risk Assessment in PPP Projects by Applying Different MCDM Methods and Comparative Results Analysis,” Administrative Sciences, vol. 8, no. 4, p. 80, 2018, doi: 10.3390/admsci8040080.

View Article

A. F. Zhang, et al., Investment Project Evaluation. Xiamen, China: Xiamen University Press, 2019.

Y. Feng, X. Guo, B. Wei, et al., “A fuzzy analytic hierarchy process for risk evaluation of urban rail transit PPP projects,” Journal of Intelligent & Fuzzy Systems, vol. 41, no. 1, pp. 1–12, 2021, doi: 10.3233/JIFS-189997.

View Article

E. Jokar, B. Aminnejad, and A. Lork, “Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods,” Operations Research Perspectives, vol. 8, p. 100190, 2021, doi: 10.1016/j.orp.2021.100190.

View Article

J. N. Tan, “Research on Financial Risk Assessment Model of Government-Paid Highway PPP Projects,” Project Management Technology, vol. 20, no. 10, pp. 52–57, 2022.

U. Arnold and O. Yildiz, “Economic risk analysis of decentralized renewable energy infrastructures - A Monte Carlo Simulation approach,” Renewable Energy, vol. 77, pp. 227–239, 2015, doi: 10.1016/j.renene.2014.11.059.

View Article

C. O. Cruz and J. M. Sarmento, “The price of project finance loans for highways,” Research in Transportation Economics, vol. 70, pp. 161–172, 2018, doi: 10.1016/j.retrec.2017.09.006.

View Article

L. Kumar, A. Jindal, and N. R. Velaga, “Financial risk assessment and modelling of PPP based Indian highway infrastructure projects,” Transport Policy, vol. 62, pp. 2–11, 2018, doi: 10.1016/j.tranpol.2017.03.010.

View Article

D. Huang, “Research on Financial Risk Measurement and Control of PPP Projects,” Finance and Accounting Monthly, no. 21, pp. 85–90, 2018.

Y. N. Wu, X. L. Hu, and L. S. Xu, “Research on Optimal Selection of Wind Power Investment Projects Based on Monte Carlo Simulation Method,” Project Management Technology, vol. 9, no. 11, pp. 111–114, 2011.

Y. Xu, R. Du, and J. Pei, “The investment risk evaluation for onshore and offshore wind power based on system dynamics method,” Sustainable Energy Technologies and Assessments, vol. 58, p. 103328, 2023, doi: 10.1016/j.seta.2023.103328.

View Article

S. Hwang and M. Kim, “Comprehensive techno-economic analysis of a floating offshore wind farm based on real options approach in the Korean power market,” Energy, vol. 335, p. 138114, 2025, doi: 10.1016/j.energy.2025.138114.

View Article

X. Y. Zhang and Y. Sun, “Application of Real Options in Offshore Wind Power Investment Decision-Making,” Proceedings of the CSU-EPSA, vol. 28, no. 10, pp. 98–104, 2016.

Y. N. Wu, X. K. Sun, Z. M. Lu, et al., “Research on Investment Risk Decision Model for Wind Power Construction Projects Based on Interval Type-2 Fuzzy AHP-VIKOR,” Science and Technology Management Research, vol. 39, no. 4, pp. 236–245, 2019.

Z. X. Li, Z. R. Qin, H. H. Wang, et al., “Research on China’s Wind Power Cost Level and Its Influencing Factors,” Price: Theory & Practice, no. 10, pp. 24–29, 2019.

L. Feng, L. M. Zhang, J. J. Wei, et al., “Development and Considerations of Offshore Wind Power Based on Life-Cycle Economic Assessment,” Electric Power, vol. 57, no. 9, pp. 80–93, 2024.

Q. Liu, Y. Sun, L. Liu, et al., “An uncertainty analysis for offshore wind power investment decisions in the context of the national subsidy retraction in China: A real options approach,” Journal of Cleaner Production, vol. 329, p. 129559, 2021, doi: 10.1016/j.jclepro.2021.129559.

View Article

H. Wang and Z. C. Wu, “Research on Investment Strategies for Wind Power Projects in the ‘Grid Parity Era’ - Analysis of Wind-Storage Power Stations in Electricity Market Environment,” Price: Theory & Practice, no. 9, pp. 125–129, 2022.

Q. H. Lou, G. H. Xie, and N. N. Li, “Economic Analysis and Development Trends of Renewable Energy Generation in the Grid Parity Era,” Electric Power, vol. 52, no. 12, pp. 1–9, 2019.

R. Zhao and Y. Chen, “Economic Analysis of Offshore Wind Power in Grid Parity Stage in Guangdong Province,” Southern Energy Construction, vol. 12, no. 5, pp. 100–107, 2025.

J. N. Tan, “Research on the Impact of Dynamic WACC Discounting on Net Present Value - A Case Study of Offshore Wind Power Projects,” Project Management Technology, vol. 19, no. 11, pp. 97–102, 2021.