[1]
W. W. Wang and Y. L. Zhuang, “Contractual Governance of Cost Risk Allocation in Power Engineering Projects under the EPC (Engineering, Procurement, and Construction) Contracting Model”, AEM, vol. 15, no. 3, pp. 2068–2074, Aug. 2026.