WANG, W. W.; ZHUANG, Y. L. Contractual Governance of Cost Risk Allocation in Power Engineering Projects under the EPC (Engineering, Procurement, and Construction) Contracting Model. Advanced Electromagnetics, [S. l.], v. 15, n. 3, p. 2068–2074, 2026. DOI: 10.7716/aem.v15i3.3256. Disponível em: https://www.aemjournal.org/index.php/AEM/article/view/3256. Acesso em: 18 aug. 2026.