[1]
Bai, M.G., Zheng, J.M. and Ma, J.J. 2026. Implementing Automatic Generation of Primary Equipment Status Awareness and Maintenance Priority Using a Hybrid GCN-RNN Architecture. Advanced Electromagnetics. 15, 3 (Aug. 2026), 2168–2175. DOI:https://doi.org/10.7716/aem.v15i3.3268.