[1]
Wang, W.W. and Zhuang, Y.L. 2026. Contractual Governance of Cost Risk Allocation in Power Engineering Projects under the EPC (Engineering, Procurement, and Construction) Contracting Model. Advanced Electromagnetics. 15, 3 (Aug. 2026), 2068–2074. DOI:https://doi.org/10.7716/aem.v15i3.3256.